![]() |
| <SR 305 Enhanced Transit Alternatives Analysis Technical Study & SR 305 Corridor Vision Project |
![]() |
|---|
(You might need a newer version of "Adobe Reader" to view the links below.)
Final Draft Report SR 305 Corridor Enhanced Transit Alternatives Analysis Technical Study Report (February, 2011)
First Draft SR 305 Corridor Enhanced Transit Alternatives Analysis Technical Study (November, 2010)
The Draft Kitsap Transit SR 305 Corridor Enhanced Transit Alternatives Analysis Technical Study reports out on the current status of the project. This preliminary draft summarizes the work executed since the release of the SR 305 Corridor Vision Study. The document summarizes the data and information collected in support of a refinement on the enhanced transit alternatives to address the long term needs of the SR 305 corridor. This draft presents an initial evaluation of the refined alternatives. After completion of the alternatives evaluation, the final report will recommend a final set of alternatives for evaluation through a formal alternatives analysis and environmental review.
Final Draft SR 305 Corridor Vision (July, 2007)
The SR 305 Corridor Vision is a study that focuses on identifying potential options for high capacity transit and other related multi-modal improvements needs in the SR 305 corridor, from Highway 3 in Poulsbo to the Winslow Ferry Terminal on Bainbridge Island.
| Updated:
September 28, 2011
Phone: (360) 373-2877 or 1-800-501-RIDE |
|